Date : 27 May 2024
Operation Performed :The Internal Flaw Detection of Shredder Main Shaft with Journal Steps
Client :KME Engineering Co.,Ltd
The Internal Flaw Detection of Axle Shaft with Gears for Turbine (7.3.24)
The Internal Flaw Detection of Solid Shafts Raw Material, Main Gear & Reducer Gear (9 & 12.12.2023)