Boiler Inspection (MT)

Date : 26 to 28 March 2015 to Present

Operation Performed : Steel Structures Rafter Joints Inspection Wood Factory Construction (MT)

Client : PECI (Myanmar) & MOS Lumber Co.,Ltd.

62