Date : 7 May 2025
Operation Performed : Weld Joints Inspection
Client :Weld Joints Inspection
View JobDate : 7 February 2025
Operation Performed WQT for the Flair Joints Between Rebar and Rebar (ϕ20mm)
IIuvia Factory, Zaykabar Compound, Mingalardon, Yangon
Client :GEOS Co., Ltd.
View JobDate : 17 June 2025
Operation Performed : 3G, Vertical (Uphill) Position, Grooved Weld, Gas Metal ARC Welding (GMAW), CO2 Gas Shielded Welding Process
Client :HTH Group Construction Co., Ltd.
View JobDate :
Operation Performed :
Client :Pann Hlaing Project CEO Temporary Office Weld Joints Inspection (MT)
View JobDate : 28 July 2025
Operation Performed : Welding Electrode Quality Test
:KISWEL, KCL-11, AWS E 6011, SMAW, Malaysia
:API 5L MS Pipes ( Grade X42- 10” x 10 mm T & X46- 14” x 12.7 mm T)
:5G, Downhill Position, SMAW Process, Multi-Layers Weld Joints
Client :Myanma Oil & Gas Enterprise (MOGE)
View JobDate : 1 July 2025
Operation Performed : NDT Inspection of Weld Joints Column, Floor Beams, Base Plates & Flanges
Client :HTH Group Construction Co., Ltd.
View JobDate : 25 July 2025
Operation Performed : DE Exhaust Ducting Assembly, Weld Seams Inspection
Client :Steel Master Company Limited
View JobDate : 6 June 2025
Operation Performed :88000 Liter Underground Oil Storage Tank
Weld Seams at End Plates & Tank Body
Client :Royal Marine Engineering Co., Ltd.
View Job