Our Supplied Records

Magnetic Particle Testing (MT)

Date : 7 May 2025

Operation Performed : Weld Joints Inspection

Client :Weld Joints Inspection

View Job

Magnetic Particle Testing (MT)

Date : 7 February 2025

Operation Performed WQT for the Flair Joints Between Rebar and Rebar (ϕ20mm)
IIuvia Factory, Zaykabar Compound, Mingalardon, Yangon

Client :GEOS Co., Ltd.

View Job

WELDER PERFORMANCE QUALIFICATION TEST

Date : 17 June 2025

Operation Performed : 3G, Vertical (Uphill) Position, Grooved Weld, Gas Metal ARC Welding (GMAW), CO2 Gas Shielded Welding Process

Client :HTH Group Construction Co., Ltd.

View Job

ULTRASONIC TEST (UT) METHOD

Date :

Operation Performed :

Client :Pann Hlaing Project CEO Temporary Office Weld Joints Inspection (MT)

View Job

VISUAL (VT) & ULTRASONIC TEST (UT) METHOD

Date : 28 July 2025

Operation Performed : Welding Electrode Quality Test
:KISWEL, KCL-11, AWS E 6011, SMAW, Malaysia
:API 5L MS Pipes ( Grade X42- 10” x 10 mm T & X46- 14” x 12.7 mm T)
:5G, Downhill Position, SMAW Process, Multi-Layers Weld Joints

Client :Myanma Oil & Gas Enterprise (MOGE)

View Job

MAGNETIC PARTICLE TESTING (MT)

Date : 1 July 2025

Operation Performed : NDT Inspection of Weld Joints Column, Floor Beams, Base Plates & Flanges

Client :HTH Group Construction Co., Ltd.

View Job

LIQUID PENETRANT (PT) METHOD

Date : 25 July 2025

Operation Performed : DE Exhaust Ducting Assembly, Weld Seams Inspection

Client :Steel Master Company Limited

View Job

ULTRASONIC TEST (UT) METHOD

Date : 6 June 2025

Operation Performed :88000 Liter Underground Oil Storage Tank
Weld Seams at End Plates & Tank Body

Client :Royal Marine Engineering Co., Ltd.

View Job