MYANMA OIL & GAS ENTERPRISE

Date : 3 February 2019

Operation Performed :UT Inspection of Weld Joints
Nyaung Don – Ywar Ma ( Ø 14”) ြGas Pipeline Ball Valve Installation System

Client :MYANMA OIL & GAS ENTERPRISE


Ultrasonic Testing Inspection of Weld Joints
Nyaung Don – Ywar Ma ( Ø 14”) ြGas Pipeline Ball Valve Installation System
(Under Shwe Pyi Thar Bridge, Hlaing Thar Yar Side)


Magnetic Particle Testing Inspection of Weld Joints
Nyaung Don – Ywar Ma ( Ø 14”) ြGas Pipeline Ball Valve Installation System
(Under Shwe Pyi Thar Bridge, Hlaing Thar Yar Side)


Ultrasonic Testing of Weld Joints of ( Ø 14”) Gas Pipeline
Shwe Pyi Thar-Ywar Ma New Replacement Gas Pipeline


UT Inspection of Weld Joints of HDD Hlaing River (Yoe Lay) Crossing Gas Pipeline (Ø14”)

UT Inspection of Weld Joints of HDD Hlaing River (Yoe Lay) Crossing Gas Pipeline (Ø14”)

MYAING KALAY ~ YANGON Ø 20″ GAS PIPELINES PROJECT ZA YIT CHAUNG STREAM (UNDER STREAM BED SECTION) Ultrasonic Testing of Weld Joints

MYAING KALAY ~ YANGON Ø 20″ GAS PIPELINES PROJECT KYAUK LONE GYI STREAM CROSSING Ø 12″ SUBSTITUTION GAS PIPELINE SECTION Ultrasonic Testing of Weld Joints

Ultrasonic Testing of Weld Joints of Gas Pipeline NYAUNG DON ~ MYO CHAUNG Ø 6″ GAS PIPE INSERTED THROUGH INTO Ø 10″ HDD PIPELINE L3200′

Ultrasonic Testing of Weld Joints of Gas Pipeline PYAY-KYANGIN-MYANAUNG Ø 10″ 5 MILES SUBSTITUTION GAS PIPELINE

Ø 4” GAS PIPELINES, THAKETA
Inspection of Weld Joints of (Ø4”) Gas Pipelines